The walk in coolers are walk in freezers are used in a variety of temperature ranges.
Walk in freezer installation guide.
The floor area that the walk in is to be installed on must be clear of all moisture dirt and debris.
Walk ins installed near existing building walls must be positioned with a minimum 2 clearance to allow for air circulation and prevent possible condensation on the exterior surface of the panels.
Once panel is inserted correctly install w2 wall panel with w1 panel male edge will be inserted into female edge of w2 panel.
Walk in cooler walk in freezer buying guide walk in refrigerator walk in freezer or combo unit.
Used for holding fruits vegetables eggs medicine and wood.
For outdoor installation the unit.
Medium temperature walk in freezer.
Walk in coolers can be setup indoors or outside.
High temperature walk in cooler.
The installer must determine the best and safest way to get the panels to the installation site without damage or bodily injury.
Walk in installation operation maintenance warranty manual job name serial number.
Walk in cooler installation steps.
On floored units place male bottom of wall panel in female groove of floor panel.
Used for holding meats seafood and stuff that needs the same temperature.
If screed was ordered with your cooler this should be laid out first.
Make sure the floor arrow on the wall panel is pointing down.
Always have a competent.
Installation 3 section 3.
Breaker strips thermal breaks are used to prevent heat transfer between the cooled side and the ambient side of a concrete floor.
Do not set a cooler thermostat below the walk ins design temperature or product freezing or excessive evaporator coil icing may result.
A minimum of 2 clearance above the walk in is recommended to install the walk in.
First choice to make is whether you need a walk in refrigerator.
On floorless walk ins work panels into pre installed screeding.
These steps are necessary to keep your walk in level square.
Check overhead for anything that could cause a safety hazard electrical wires utility lines air ducting or any other obstructions.
The first step is to install the base channel which is attached directly to the floor with concrete anchors.
Indoor or outdoor walk in cooler.
2 walk in cooler freezer application.
The types of screeds furnished with your unit will be identified on the unit assembly drawing.
Locate the screed floor sealer diagram which was packed in the hardware box and using it as a guide draw an outline of the outside dimensions of the installed screed directly onto the building floor where the walk in will be situated.