See versa lok tech bulletin 2 for construction details.
Versa lok laminate installation tricks.
To ensure the best possible experience during your installation it is important to follow all installation instructions.
Installing in an environment that is not controlled could come back to haunt the retailer and installer not to mention the dissatisfied end user.
These mortarless walls do not need frost footings.
As you proceed level each unit front to back side to side and with adjacent units.
Installing your shaw laminate floor can be a rewarding experience.
Align straight wall sections using a string line or by sighting down the grooves on unit tops.
Wrap the pedestal in filler fabric.
Construct the base pedestal in four to five increments.
Standard design installation guidelines.
The hvac system must be operational and controlled prior to during and post installation with minimum maximum temperature and humidity.
Sidewalls will be stacked vertically without pinning.
Place versa lok units on prepared leveling pad.
In this video brian shows exactly how the pl.
There s nothing quite like sitting back after a job well done and admiring your handi work.
The floorté family of rigid core products are our top selling luxury vinyl floors for good reason they are beautiful durable and easy to install.
Family owned operated and started f.
How to set a retaining wall base versa lok blocks we are a local lawn and landscaping company based out of freeburg il.
Installing the base course.
All floorté luxury vinyl products floorté classic series floorté pro series floorté elite series boast the following installation benefits.
Versa lok retaining wall systems are cost effective easy to install and give you endless design options.
Square foot design installation guidelines.
Excavating soils and incorporating embedment.
Versa lok segmental retaining walls are made from high strength concrete units dry stacked interlocked with pins and set on granular leveling pads.
Shoreline waterway protection.
Leveling is critical at this stage so take your time.
Construct the stair risers first install the caps for treads second and then install sidewalls last.
Do not pin the stair units.
Check out more flooring installation tips and tricks.