Please reference these documents to aid in the installation of your composite decking.
Veranda stair railing installation instructions.
Veranda premier railing installation instructions.
Veranda vinyl rail features polycomposite technology making it our strongest and most durable core ever.
Slide two top and bottom rail brackets on ends of completely built rail sections fig.
Install blocking at post locations.
Railing kit makes it the perfect product for the do it yourselfer and the professional deck builder.
Made of quality pressure treated 1 southern yellow pine and black aluminum balusters your new stylish railing will be the talk of the neighborhood.
Use existing posts or install 4 x 4 posts using the surface mount bracket instructions in the pre determined locations cover with post sleeve and verify spacing.
1 if using co fig.
Stair railing installation.
Questions problems missing parts.
Posts should be plumb in both directions.
Cedar or pressure treated pine 4x4 railing posts or a post mount provides the structural strength for the stair railing.
1 measure the inside distance between properly installed plumb posts.
Next post next veranda traditional railing installation instructions.
Layout railing installation to determine post locations.
1 using at least three 3 10x3 deck screws sold separately penetrating through the joists at least 1 into the blocks fig.
Determine the number of stair railing posts needed for your deck.
Cut two 3 temporary wood spacer blocks not included to insert under ends of railing sections to temporarily assist in aligning railing section fig.
The fast and easy installation of the 8 the fast and easy installation of the 8 ft.
Beneath all post locations install at least two 2 2x8 blocks fig.
Install stair railing posts prior to installing stair treads.
Installation instructions are intended as a general guideline based on common building practices used in railing.
Step clip hidden fastening system.
Post spacing is 6 on center.
With no wood fiber or organic fillers added the polycomposite core resists warping and swelling and retains strength over time regardless of the environment.
Ve moulding slide the post down into the cove moulding prior to securing any railings fig.
Careful planning of your project will offer the best results.